I will do precise hvac takoff for complete hvac system

Residential Building

HVAC Takeoff: PlanSwift/CAD marked plans & Excel BOM (Ducts, Pipes, Units, Fittings).

Delivery Time
2 Days
Package Includes: see all
data:image/svg+xml,%3csvg%20width='18'%20height='18'%20viewBox='0%200%2018%2018'%20fill='none'%20xmlns='http://www.w3.org/2000/svg'%3e%3cpath%20d='M2.02684%207.18506L0.777169%208.43236C0.626925%208.58246%200.542442%208.78608%200.542295%208.99845C0.542147%209.21082%200.626347%209.41456%200.776382%209.56486L2.02524%2010.8149L1.56917%2012.517C1.51419%2012.7222%201.54297%2012.9408%201.64918%2013.1248C1.7554%2013.3088%201.93035%2013.443%202.13554%2013.498L3.83684%2013.9539L4.29446%2015.6595C4.3494%2015.8646%204.48357%2016.0396%204.66748%2016.1458C4.7586%2016.1984%204.85918%2016.2326%204.9635%2016.2463C5.06781%2016.26%205.17381%2016.253%205.27543%2016.2258L6.98201%2015.7676L8.23065%2017.0185C8.38086%2017.1687%208.58458%2017.2531%208.79701%2017.2531C9.00943%2017.2531%209.21316%2017.1687%209.36337%2017.0185L10.6135%2015.7696L12.3148%2016.2255C12.52%2016.2805%2012.7386%2016.2517%2012.9226%2016.1455C13.1065%2016.0393%2013.2408%2015.8643%2013.2957%2015.6591L13.7516%2013.9578L15.4582%2013.4997C15.5598%2013.4724%2015.6551%2013.4253%2015.7386%2013.3612C15.822%2013.2971%2015.892%2013.2171%2015.9446%2013.126C15.9971%2013.0348%2016.0312%2012.9341%2016.0448%2012.8297C16.0584%2012.7254%2016.0513%2012.6194%2016.024%2012.5177L15.5654%2010.8127L16.815%209.5654C16.9648%209.415%2017.049%209.21149%2017.0494%208.99923C17.0497%208.78698%2016.9661%208.58321%2016.8168%208.43234L15.5679%207.18225L16.0238%205.48095C16.0788%205.27576%2016.05%205.05713%2015.9438%204.87317C15.8376%204.6892%2015.6626%204.55496%2015.4574%204.49998L13.7554%204.0439L13.2972%202.33733C13.2601%202.20189%2013.1883%202.07844%2013.089%201.97914C12.9897%201.87984%2012.8663%201.80809%2012.7308%201.77097C12.5962%201.7349%2012.4528%201.73462%2012.3152%201.77155L10.6102%202.23015L9.36134%200.980061C9.21124%200.829817%209.00762%200.745334%208.79525%200.745186C8.58288%200.745038%208.37914%200.829237%208.22884%200.979271L6.97952%202.22832L5.27821%201.77246C5.07302%201.71748%204.85439%201.74626%204.67043%201.85248C4.48646%201.95869%204.35222%202.13364%204.29724%202.33883L3.84137%204.04013L2.13479%204.4983C2.03314%204.52559%201.93786%204.57263%201.8544%204.63676C1.77095%204.70088%201.70094%204.78083%201.6484%204.87202C1.59585%204.96321%201.5618%205.06387%201.54818%205.16823C1.53456%205.27259%201.54164%205.37862%201.56902%205.48024L2.02684%207.18506ZM9.69208%2013.3933C9.38422%2013.3107%209.12178%2013.1092%208.96249%2012.8331C8.80321%2012.557%208.76013%2012.229%208.84273%2011.9211C8.92533%2011.6132%209.12685%2011.3508%209.40295%2011.1915C9.67904%2011.0322%2010.0071%2010.9892%2010.315%2011.0718C10.6228%2011.1544%2010.8853%2011.3559%2011.0446%2011.632C11.2038%2011.9081%2011.2469%2012.2361%2011.1643%2012.544C11.0817%2012.8519%2010.8802%2013.1143%2010.6041%2013.2736C10.328%2013.4329%209.99994%2013.4759%209.69208%2013.3933ZM11.4501%205.90391L12.4394%207.16323L6.13894%2012.1088L5.14962%2010.8494L11.4501%205.90391ZM7.89675%204.62011C8.04919%204.66101%208.19208%204.73153%208.31726%204.82766C8.44244%204.92378%208.54747%205.04361%208.62634%205.18032C8.70521%205.31703%208.75638%205.46794%208.77692%205.62442C8.79747%205.78091%208.787%205.93991%208.7461%206.09235C8.7052%206.24478%208.63467%206.38767%208.53855%206.51285C8.44243%206.63803%208.32259%206.74306%208.18588%206.82193C8.04917%206.90079%207.89827%206.95196%207.74178%206.97251C7.5853%206.99306%207.4263%206.98259%207.27386%206.94169C6.966%206.85908%206.70356%206.65757%206.54427%206.38147C6.38499%206.10537%206.34191%205.77731%206.42451%205.46945C6.50711%205.16159%206.70863%204.89915%206.98473%204.73987C7.26082%204.58059%207.58889%204.53751%207.89675%204.62011Z'%20fill='%23D8BC7F'/%3e%3c/svg%3e3

Service details

Professional HVAC System Takeoff & Estimation Services


🛠️ What’s Included in the Service?

I provide a meticulous breakdown of all mechanical components found in your project blueprints:

  • Detailed Equipment Schedule: Precision counts for RTUs, AHUs, Split Systems, VAV boxes, Exhaust Fans, and FCUs.
  • Ductwork Quantification: Breakdown of rectangular, round, and oval ducting by size, material (Galvanized, Stainless, Aluminum), and gauge.
  • Piping & Hydronics: Complete takeoff for chilled water, hot water, refrigerant piping, and condensate lines, including fittings and valves.
  • Air Distribution: Itemized counts for Grilles, Registers, Diffusers (GRDs), and Louvers.
  • Insulation & Accessories: Accurate linear footage for duct wrap, piping insulation, and counts for fire dampers and VCDs.


📊 Deliverables You Will Receive

  1. Marked-up Drawings (PDF): Color-coded, high-resolution drawings exported from PlanSwift/AutoCAD showing exactly what was counted. This serves as your visual verification.
  2. Comprehensive Material List (Excel): A formatted, easy-to-read spreadsheet categorized by system, floor, or zone.
  3. Bill of Quantities (BOQ): Ready for vendor pricing, including all mechanical specialties and hardware.

🚀 Why Choose This Service?

  • Software Mastery: Expert-level use of PlanSwift for rapid on-screen takeoff and AutoCAD for complex architectural layouts.
  • Accuracy Guaranteed: I account for every transition, elbow, and flex duct to ensure your material orders are spot-on.
  • Quick Turnaround: I understand the pressure of bid deadlines and provide reliable, timely delivery.
  • Clear Communication: I highlight any plan discrepancies or missing information (RFIs) immediately to save you headaches later.



HVAC Takeoff Services

Mechanical Estimating

PlanSwift HVAC Takeoff

Ductwork Quantification

Mechanical Bill of Materials (BOM)

HVAC Material List Excel

AutoCAD Mechanical Takeoff

Construction Estimation

Key details

  • Building Type
    CommercialResidentialOffice & Workspace
  • Field of Expertise
    HeatingVentilatingAnd Air Conditioning (Hvac)
  • Software
    PlanswiftMicrosofot ExcelAutocad
Special note from freelancer
Please have a conversation with me before placing any order and share the drawings and what material you require to takeoff
FAQs
No FAQs added yet.
D

Dwarikesh Pal

    BIM Specialist |MEP BIM Modeler |HVAC Design

    With over 3 years of hands-on experience as a Mechanical Design Engineer, I specialize in bridging the gap between complex engineering concepts and precise digital execution. Technical Expertise Design & Modeling: Revit (MEP), AutoCAD, SolidWorks. Estimation & Takeoff: PlanSwift, HAP (5.1/6.2), MS Excel. Specializations: HVAC Load Calculations, Duct & Pipe Routing, Bill of Quantities (BOQ), and BIM Coordination (LOD 300-500).

    Osdire section promoting freelance work opportunities

    Launch Offer Earn up to $500* extra on your first 10 offers created

    Terms and conditions apply